Energy Services
This activity includes the company’s active participation in the electric power and oil services sector, being among the most important foundations of national economies. Therefore, our company has specialized in providing its services to governmental, foreign, and investment companies through the following sectors:
Oil Services Sector:
Given the importance of oil and natural gas as primary sources of energy and their contribution to daily industries, and based on the necessity of their optimal utilization, our company has engaged in contracts for the supply, execution, and rehabilitation of oil units and facilities, in cooperation with governmental companies, private sector companies, and investment entities operating in this field, through executing the following:
Supplying and executing oil and oil-derivative storage tanks of various sizes and types, including:
Tanks with electric arc welding.
Bolted tanks according to American specifications.
Spherical natural gas tanks.
Execution of oil and natural gas pipelines in all their stages: supply, laying, welding, installation of valves and locks.
Rehabilitation and execution of complete civil, mechanical, and electrical works for oil facilities.
Projects Implemented by Saheel Al-Mortajez Co.
1. Saheel Al-Mortajez Company projects with the American-Angolan company Sonangol Pesquisa & Producao IRAQ in Qaiyara Oilfield for the years 2018–2020:
The SWB-85 pump installation project at Qaiyara Oilfield was executed under Contract No. SCA18-QAI-00034 dated 20/10/2018, completed in seven days.
The umbrella base construction project at Qaiyara Oilfield was carried out under Contract No. SCA18-QAI-00046 dated 21/11/2018, completed in seven days.
The container canopy preparation and installation project at Qaiyara Oilfield was executed under Contract No. SCA18-QAI-00046 dated 25/11/2018, completed in eight days.
The diesel tank installation project at NDS field was based on Contract No. SCA18-QAI-00050 dated 04/12/2018, completed in nine days.
The installation of pumps 49 and SWB-51 was carried out under Contract No. RFQ-19-QAI-PRJ-0001 dated 12/02/2019, completed in fifteen days.
The fire fighting system implementation and testing project at SWB field was executed under Contract No. CON-19-QAI-PRJ-0019 dated 06/03/2019, completed in nine days.
The new flow line commissioning project from 91 to MWB-98 was carried out under Contract No. CON-19-QAI-PRJ-0019 dated 08/03/2019, completed in twelve days.
The construction of a new fence around the southern unloading station at Qaiyara Oilfield was executed under Contract No. ITT-19-QAI-SEC-0079 dated 10/12/2019, completed in eight days.
The removal of all tanks, pipelines, and pumps at SWB-91 was executed under Contract No. ITT-19-QAI-PRJ-0083 dated 10/12/2019, completed in nine days.
The drilling platform construction for well NJE6 at Najma Oilfield – Qaiyara was carried out under Contract No. CON-20-NAJ-DRL-0011 dated 25/9/2020, completed in fifty days.
2. Saheel Al-Mortajez Company projects executed under contracts with governmental departments and Iraqi and foreign companies in 2021:
The civil works for pipeline crossings (corridors) in NDS project at Najma Oilfield, Qaiyara, were executed under Contract No. CON-21-QAI-PRJ-0002 dated 04/01/2021 with Sonangol Pesquisa & Producao IRAQ, completed in 35 days.
The mechanical works for leak repair in the flow line of well 68 and discharge line of well SWB-72 SDS were executed under Contract No. CON-21-QAI-PRJ-0007 dated 08/03/2021 with Sonangol Pesquisa & Producao IRAQ, completed in seven days.
The mechanical works to install connection points and reroute flow lines to NDS EPF (towers 62, 64, 65, 66, SWB-67) were executed under Contract No. CON-21-QAI-PRJ-0007 dated 27/03/2021 with Sonangol Pesquisa & Producao IRAQ, completed in 33 days without production impact.
3. Saheel Al-Mortajez Company projects executed under contracts with governmental departments and Iraqi and foreign companies in 2022:
The gas cylinder repair workshop rehabilitation in Hammam Al-Alil, Nineveh Governorate, was executed under Contract No. 60 dated 29/12/2021 with the Ministry of Oil / General Company for Gas Filling and Services, duration 90 days, commenced 26/06/2022, completed 22/09/2022.
The oil tank FB 2116 rehabilitation project at Salahuddin Refinery Pump & Storage Complex was executed under Contract No. 51 dated 07/07/2022 with the Ministry of Oil / North Refineries Company / Al-Sumood Refinery, duration 360 days, commenced 28/07/2022, completed 27/08/2023.
4. Saheel Al-Mortajez Company projects with Iraqi and foreign oil companies in 2022–2023:
Maintenance of rotating equipment at SWB 49 & SWB 85 was executed under Contract No. CON-22-QAI-OPS-0030 dated 28/11/2022 with Sonangol Pesquisa & Producao Iraq, duration 10 days, completed.
Moving the tanks and materials from the scrap area was executed under Contract No. CON-23-QAI-OPS-0002 dated 17/01/2023 with Sonangol Pesquisa & Producao Iraq, duration 6 days, completed.
Connection of the drain of each batching controller to the drain system of WB-91 was executed under Contract No. CON-23-QAI-OPS-0009 dated 13/02/2023 with Sonangol Pesquisa & Producao Iraq, duration 12 days, completed.
Civil works for maintenance of the existing generator steel shed at SWB67 were executed under Contract No. CON-23-OAI-OPS-0018 dated 21/03/2023 with Sonangol Pesquisa & Producao Iraq, duration 10 days, completed.
Removal of stand-alone tank and connected piping network from WB 67 was executed under Contract No. CON-23-QAI-OPS-0023 dated 02/04/2023 with Sonangol Pesquisa & Producao Iraq, duration 10 days, completed.
Installation of additional loading arms at TLS-2 was executed under Contract No. CON-23-QAI-OPS-0040 dated 13/07/2023 with Sonangol Pesquisa & Producao Iraq, duration 29 days, completed.
Civil works for constructing a steel shed for PSD vehicles parking area at NDS in Qaiyara Oilfield were executed under Contract No. CON-23-QAI-PRJ-0042 dated 13/07/2023 with Sonangol Pesquisa & Producao Iraq, duration 5 days, completed.
Fabrication and installation of a sunshade for the burner EPF-NDS were executed under Contract No. CON-23-QAI-OPS-0052 dated 31/07/2023 with Sonangol Pesquisa & Producao Iraq, duration 23 days, completed.
5. Saheel Al-Mortajez Company projects with Iraqi and foreign oil companies in 2024–2025:
Installation of a 4-inch Vimpi pump at WB-49 was executed under Contract No. CON-24-QAI-OPS-0008 dated 24/01/2024 with Sonangol Pesquisa & Producao Iraq, duration 14 days, completed.
Re-routing of discharge line of SWB-(72,40) pump to PF-91, Qaiyara Oilfield, was executed under Contract No. CON-24-QAI-OPS-0027 dated 16/03/2024 with Sonangol Pesquisa & Producao Iraq, duration 18 days, completed.
Piping modification at SDS Refinery for online calibration was executed under Contract No. CON-24-QAI-OPS-0021 dated 28/04/2024 with Sonangol Pesquisa & Producao Iraq, duration 10 days, completed.
Installation of steel structure under motors of Vimpi pumps at SWBs Oilfield was executed under Contract No. CON-24-QAI-OPS-0041 dated 26/06/2024 with Sonangol Pesquisa & Producao Iraq, duration 12 days, completed.
Construction works of fire water network around PF at WB-91 were executed under Contract No. CON-24-QAI-PRJ-0069 dated 05/10/2024 with Sonangol Pesquisa & Producao Iraq, duration 47 days, completed.
Supply, testing, installation, and connection of ten fuel tanks (eight vertical daily tanks of 37,500 liters each and two main vertical tanks of 200,000 liters each) were executed under Contract No. IRQ-PW-LC-NRC-(5) dated 07/01/2025 with IRATRAG Co., duration 65 days, completed.
Mechanical and piping construction works for the upgradation of WB67 were executed under Contract No. CON-25-QAI-PRJ-0018 dated 13/03/2025 with Sonangol Pesquisa & Producao Iraq,duration 77 days, ongoing.
Mechanical and civil works for new heater installation in PF 91 were executed under Contract No. CON-25-QAI-PRJ-0024 dated 15/03/2025 with Sonangol Pesquisa & Producao Iraq, duration 70 days, ongoing.
info@saheel-iraq.com, +964 782 826 4320, +964 772 443 4382